Funded entirely by charitable donations the Defence Medical Rehabilitation Centre (DMRC Stanford Hall) was completed in 2018 and is now operational by the Ministry of Defence as the UK’s leading facility for trauma rehabilitation of those in the armed forces.

Lighting Control Highlights

  • Hardwired hubs were featured across the facility. SPH 27’s, SPH 48’s featured in circulation areas, external areas and consultant rooms
  • A number of buildings on the project are not connected, therefore the IP area controllers are utilised to allow the client lighting control over their own network

Got a project?

Sector:
Healthcare
Status:
Completed
SQ M:
47,000
SQ Ft:
154,199
Main Contractor:
Interserve Construction Limited
M&E Engineer:
1st Step Solutions
Architect:
Steffian Bradley Architects

Simmtronic have been a valued member of the DBS supply chain for over 10 years. Their pro-active and collaborative approach to lighting controls from the design stage, through to commissioning is highly valued by both our Design and Delivery Engineers.

MATT HALLAMDERRY BUILDING SERVICES

Thank you Simmtronic, for your professional, fast and reactive support with the delivery of these projects.

ADAM SCADDINGEDDS LIMITED

Simmtronic has constantly been available at an early stage to engage both with the designers and the Contracting team to assist with design solutions and to test options. Simmtronic is seen as ‘industry standard’ and it is always encouraging to see them involved.

JO BENSONDERWENT LONDON

Landsec have consistently used Simmtronic Lighting Control Systems across our new London developments for over 15 years, they have a customer focused and flexible approach that suits the needs of our business and as well as our customers.

MARK PONZINILANDSEC

Simmtronic have delivered a large number of technically challenging projects for DBS and consistently continued to provide outstanding service. Their support, guidance and help throughout the process has been exceptional, working closely with our design teams to ensure the right solution for the project and a sound understanding of the brief, with our delivery teams to ensure the installation and commissioning are trouble free and then providing fantastic after care to the customer. They have added true engineered value into the projects they have been involved in for Derry Building Services.

GEOFF CABORNDERRY BUILDING SERVICES

Over the years I have really appreciated the Simmtronic ability to provide responsive support and listening to projects and clients needs. More recently the Simmtronic team has shown the capability to embrace the connectivity requirements of the Internet of Things by quickly adding MQTT to their range of integration protocols. This will greatly facilitate telemetry applications in buildings and the development of interconnected solutions that will make buildings more usable and easier to operate.

FRANCESCO ANSELMOARUP

Simmtronic as an organisation has been, for the last 18 years, by far the best performing and most reliable lighting control system I use. From design through to commissioning and soft landings with the landlord teams Simmtronic always deliver on my projects. Simmtronic technology evolution is not just pushed through like others, but rather properly tested internally first, giving us as client teams the assurance that what Simmtronic say they can offer is 100% delivered, an absolute must with fast track major projects.

ALAN WILLIAMSONMULTIPLEX
Close Menu