Projects

2 York Road

London

  • Sector: commercial
  • Status: Ongoing
  • Control Protocol: DALI
  • No. of Floors: 27
  • Developer: Canary Wharf Group/Qatari Diar
  • Main Contractor: Laing O'Rourke
  • Architect: Perkins + Will

LIGHTING CONTROL HIGHLIGHTS:

  • 2 York Road upgraded their original DSI system to DALI throughout the building

DID YOU KNOW:

  • The Shell Centre, Waterloo is located on Belvedere Road in the London Borough of Lambeth SE1
  • The well-know building is located at 2 York Road and has become a prominent feature on the South Bank of the River Thames
  • Designed by Sir Howard Robertson, the building is one of the two central offices of the oil and gas giants who are the third-largest company in the world, measured by 2018 revenues
  • As a major energy producer and supplier, Shell provides 13% of the UK’s total oil and gas production
  • A plaque in the lobby of Shell Centre reads: ‘Shell Centre was build between 1957 and 1962 as the central offices in London of the Royal Dutch/Shell Group of Companies. The site covers an area of 7.5 acres and forms part of the London County Council’s comprehensive development scheme for the South Bank of The River Thames’
  • The current Shell site, which includes the aforementioned Shell Centre Tower, is currently being redeveloped as Southbank Place by Braeburn Estates (a joint venture by Canary Wharf Group and Qatari Diar). This redevelopment of the 5.25 acre site retains the 27-storey tower and introduces additional office, retail and residential

Thank you Simmtronic, for your professional, fast and reactive support with the delivery of these projects.

Adam Scadding

EDDS Limited

Simmtronic have delivered a large number of technically challenging projects for DBS and consistently continued to provide outstanding service. Their support, guidance and help throughout the process has been exceptional, working closely with our design teams to ensure the right solution for the project and a sound understanding of the brief, with our delivery teams to ensure the installation and commissioning are trouble free and then providing fantastic after care to the customer. They have added true engineered value into the projects they have been involved in for Derry Building Services.

Geoff Caborn

Derry Building Services

Simmtronic have been a valued member of the DBS supply chain for over 10 years. Their pro-active and collaborative approach to lighting controls from the design stage, through to commissioning is highly valued by both our Design and Delivery Engineers.

Matt Hallam

Derry Building Services

Over the years I have really appreciated the Simmtronic ability to provide responsive support and listening to projects and clients needs. More recently the Simmtronic team has shown the capability to embrace the connectivity requirements of the Internet of Things by quickly adding MQTT to their range of integration protocols. This will greatly facilitate telemetry applications in buildings and the development of interconnected solutions that will make buildings more usable and easier to operate.

Francesco Anselmo

Arup

Landsec have consistently used Simmtronic Lighting Control Systems across our new London developments for over 15 years. Simmtronic understand our requirements and get involved at the very early stages of schemes, assisting consultants in achieving the optimum design solution, often taking the lead.  They always overcome the programme challenges they are faced with on site, delivering a quality, fully tested and operational solution, on time and to budget. Simmtronic undertake the maintenance and servicing across much of our London portfolio, they have a customer focused and flexible approach that suits the needs of our business and as well as our customers.

Mark Ponzini

LandSec

Simmtronic as an organisation has been, for the last 18 years, by far the best performing and most reliable lighting control system I use. From design through to commissioning and soft landings with the landlord teams Simmtronic always deliver on my projects. Simmtronic technology evolution is not just pushed through like others, but rather properly tested internally first, giving us as client teams the assurance that what Simmtronic say they can offer is 100% delivered, an absolute must with fast track major projects.

Alan Williamson

Multiplex

Simmtronic has constantly been available at an early stage to engage both with the designers and the Contracting team to assist with design solutions and to test options. This ultimately assists us in de-risking the project during the commissioning phase which usually defines when the project is completed. Simmtronic is seen as ‘industry standard’ and it is always encouraging to see them involved.

Jo Benson

Derwent London