Projects

One Poultry

London

  • Sector: commercial
  • Status: 1997, Ongoing fit-out
  • Control Protocol: DALI
  • A/C Network: T-Bus
  • SQ M: 13,000
  • SQ FT: 110,000
  • Developer: City Acre Property Investments
  • Main Contractor: Laing O'Rourke
  • Tenants: WeWork
  • M&E Engineers: Arup
  • Architect: James Stirling/BuckleyGreyYeoman

LIGHTING CONTROL HIGHLIGHTS:

  • 9-port analogue boxes selected for ceiling, allowing an efficient three-by-three luminaire pattern, flexible configuration via SPECS Manager graphical software, built in emergency test and load shedding support and fade processing
  • Simmtronic originally worked on the 1997 CAT A project and the 2018 project when WeWorks bought the building. Simmtronic were able to support their 1-10V existing luminaires within our latest system

DID YOU KNOW:

  • The iconic One Poultry was re-established as creative office space and retail building in 2018, after undergoing extensive refurbishment to celebrate the building’s original splendour
  • The stone-clad office and retail facade clad in pink and yellow limestone with stripes and blocks of colour, was originally designed by the late Sir James Stirling and completed in 1998, six years after his death
  • One Poultry is rated a masterpiece of the postmodernist style and is the youngest listed building in England, on a site of high archaeological importance
  • Steeped in history, its background set significant physical and legislative constraints on the original project – involving the UK’s largest archaeological investigation by the Museum of London
  • The original excavation had identified the presence of the Via Decumana, an old Roman (AD50) road crossing the site, suggesting this may be the date of the founding of the Roman city of Londinium

Thank you Simmtronic, for your professional, fast and reactive support with the delivery of these projects.

Adam Scadding

EDDS Limited

Simmtronic have delivered a large number of technically challenging projects for DBS and consistently continued to provide outstanding service. Their support, guidance and help throughout the process has been exceptional, working closely with our design teams to ensure the right solution for the project and a sound understanding of the brief, with our delivery teams to ensure the installation and commissioning are trouble free and then providing fantastic after care to the customer. They have added true engineered value into the projects they have been involved in for Derry Building Services.

Geoff Caborn

Derry Building Services

Simmtronic have been a valued member of the DBS supply chain for over 10 years. Their pro-active and collaborative approach to lighting controls from the design stage, through to commissioning is highly valued by both our Design and Delivery Engineers.

Matt Hallam

Derry Building Services

Over the years I have really appreciated the Simmtronic ability to provide responsive support and listening to projects and clients needs. More recently the Simmtronic team has shown the capability to embrace the connectivity requirements of the Internet of Things by quickly adding MQTT to their range of integration protocols. This will greatly facilitate telemetry applications in buildings and the development of interconnected solutions that will make buildings more usable and easier to operate.

Francesco Anselmo

Arup

Landsec have consistently used Simmtronic Lighting Control Systems across our new London developments for over 15 years. Simmtronic understand our requirements and get involved at the very early stages of schemes, assisting consultants in achieving the optimum design solution, often taking the lead.  They always overcome the programme challenges they are faced with on site, delivering a quality, fully tested and operational solution, on time and to budget. Simmtronic undertake the maintenance and servicing across much of our London portfolio, they have a customer focused and flexible approach that suits the needs of our business and as well as our customers.

Mark Ponzini

LandSec

Simmtronic as an organisation has been, for the last 18 years, by far the best performing and most reliable lighting control system I use. From design through to commissioning and soft landings with the landlord teams Simmtronic always deliver on my projects. Simmtronic technology evolution is not just pushed through like others, but rather properly tested internally first, giving us as client teams the assurance that what Simmtronic say they can offer is 100% delivered, an absolute must with fast track major projects.

Alan Williamson

Multiplex

Simmtronic has constantly been available at an early stage to engage both with the designers and the Contracting team to assist with design solutions and to test options. This ultimately assists us in de-risking the project during the commissioning phase which usually defines when the project is completed. Simmtronic is seen as ‘industry standard’ and it is always encouraging to see them involved.

Jo Benson

Derwent London